Do you master the whole process of asphalt mixing plant? The whole process of its work is the fusion of stone stirring, slag powder stirring and asphalt stirring. You can find lots of details below.
1. Stone transportation. Cold Stone Supply System software is used to store various raw materials. First, the sand and gravel are sent to the drying system software by the inclined continuous feeding belt conveyor, and the dried and heated stones are sent to the screening system software by the hot stone hopper elevator. In the vibrating screen, according to the particle size, no same stone enters into the hot aggregate hopper, then the stone is sent to the stone weighing equipment, and after weighing, it is sent to the mixing drum. It is the whole process of transporting stones;
2. Transportation of slag powder. In the whole process of stone transportation, there is a drying process, which will generate some smoke and dust, so these smoke and dust will be collected by the dust collector system software, and then enter the incoming powder bin, and the new slag powder will be sent to the slag powder bin, and after mixing into the slag powder weighing equipment. After weighing, the slag micropowder is poured into the mixing drum. This is the whole process of slag powder transportation;
3. Asphalt transportation. The asphalt pump is used to pour the asphalt into the asphalt tank, which plays a key role in heat preservation and heating. The bitumen is then sent to the bitumen weighing equipment. After weighing, the selected bitumen is discharged into the mixing drum. This is the whole process of asphalt transportation.
After the above steps are completed, stir evenly in the mixing drum for a specified time. The mixed asphalt mixture is discharged into the finished product storage hopper. The asphalt mixture is then transported to the construction site by heated asphalt tankers.